Luxury Outlook 2023
An ambitious exploration into high-end residential markets across the globe.
Property details
Property type
Townhouse
Status
Available
Innovative concept of vertical urban living, with minimalist architecture.
The „Irina” Townhouse is part of a residential project that brings urban regeneration to front. The concept of this residential project integrates modern architecture in an urban landscape where the French influence architectural styles, such as the classicized eclectic and the later emerged Art Deco intertwine. If we were to transpose this cosy villa into the scent of a perfume, it would be named "Belle". The enclave created by the layout of the project resembles a small intimate entrance, characteristic of the streets in the ultra-central area of ??the Capital.
The project, authorized and with a completion date for the second part of 2024, will include 5 townhouse type villas with spaces designed to surprise with utility and provide the necessary comfort for an urban and dynamic lifestyle. The attention to detail is found in every aspect and is the mark of a developer and architects with numerous projects, that decorate the city with splendid modern facets of the new Little Paris. The previous projects are appreciated and built to high standards, both in terms of the quality of the execution and the materials used, as well as through the characteristics that meet the demands of European standards for new residential buildings.
The design of this project includes intimate private terraces and gardens, large glazed spaces that make light abound in rooms arranged with an unusual sense of space. The underground parking lots, with individual access to each of the houses, complete the landscape of a modern home.
The "Irina" townhouse villa can be purchased completed at the "grey" stage, for the price of 585,000 euros, plus VAT, or with the interior finishes completed, at the price of 615,000 euros, plus VAT.
Two underground parking spaces and a storage space are included in the price.
Note: the renderings are for presentation purpose only. The project is under construction and due to be finished in the 2nd part of 2024.